Transmission lines are often located in mountainous or remote areas, making on-foot or helicopter inspections difficult, time-consuming, and dangerous. Inspections rely on manual labor that doesn’t always capture accurate data for a proper assessment. Manual inspections are not only time-consuming, they're expensive: inspecting 150 miles of power lines and 2,000+ transmission … [Read more...] about The Gremsy T3 for Industrial Applications: Power Line Inspection Takes Flight in the U.S.







